Velopedia Bicycle Archive

1998 Merlin Critical Path

Original specifications: Shimano XTR drivetrain · 26" wheels · 24.5 lb published weight.

Share owner experience

Planning to sell? Draft your listing

No archive photo is available for this record.

At a glance

Archive #70252
Model year
1998
Category
Mountain
Original MSRP
$4,995.00
Sizes
15", 17", 19"
Colors
Brushed
Weight
24.5 lb
Geometry
Legacy reference
In this record
28 specifications · original MSRP · geometry
Original build3Al/2.5V titanium · Shimano XTR · 26" wheels

Manufacturer catalog

Published sizes and colors

3 sizes · 1 color

Manufacturer-published sizes and colors; availability and exact size/color pairings may vary by market or production run.

Published sizes

15"17"19"

Published colors

Brushed

Frameset

Frame ConstructionTIG-welded
Frame Material3Al/2.5V titanium
ForkRock Shox Indy SL
Fork MaterialAluminum/magnesium, triple-clamp crown
Rear ShockRock Shox Super Deluxe, 3.5" travel

Drivetrain

Component GroupShimano XTR
ShiftersShimano XTR RapidFire SL
Front DerailleurShimano XTR, bottom-pull/clamp-on 35.0mm
Rear DerailleurShimano XTR SGS
CranksetShimano XTR M950, 24/34/46 teeth
Bottom BracketShimano BB-M950, 112.5mm spindle
BB Shell Width68mm English
Rear Cogs8-speed, 11 - 34 teeth
ChainShimano CN-IG90, 1/2 x 3/32"
PedalsNot included

Brakes

BrakesShimano XTR V-Brake brakes, Shimano XTR levers

Cockpit & Contact Points

Headset1 1/8" threadless Chris King NoThreadSet
HandlebarSyncros Hardcore
Handlebar ExtensionsNot included
StemSyncros Hardcore
SaddleBontrager w/titanium rails
SeatpostSyncros Hardcore aluminum, 27.2mm diameter

Wheels & Tires

HubsShimano XTR
RimsMavic 217 SUP, 32-hole
SpokesWheelsmith stainless steel, 2.0mm double-butted
Spoke NipplesAlloy nipples
Front Tire26 x 2.10" WTB VelociRaptor kevlar
Wheel Size26" wheels

Geometry

Legacy reference · 6 measurements

Historical measurements. Frame size unknown.

All geometry measurementsLegacy reference · 6 measurements
MeasurementLegacy reference
Top tube584.2 mm
Head-tube angle71°
Seat-tube angle73°
Chainstay / rear center425.4 mm
Wheelbase1056.6 mm
Fork offset / rake40.6 mm

Frame size not recorded.

Gearing

Lower gears help on climbs. Higher gears suit higher speeds.

RPM

RPM = pedal turns per minute.

All published sizes46/34/24T · 11–34T · 8-speed
Lowest0.71:1 Highest4.18:1 Total range592%
Estimated speed At 90 RPM Lowest gear5.0 mph Highest gear29.3 mph

Uses front tire 26×2.1; rear size isn’t listed.

How it works

Ratio = front teeth ÷ rear teeth. Hub gears also include the hub’s internal ratio. A 400% range means the highest ratio is four times the lowest.

Speeds are estimates from tire size and pedal cadence. Actual speeds vary.

Try other gearing

Try your current gearingChanged tires or gears? Calculate your setup.

Your changes apply to this calculation. The archived build stays unchanged.

Your gearing setup
Gears

Use up to three front tooth counts, separated by /. For one rear sprocket, enter the same count twice.

Rear tire

Apply the marking on your rear tire or edit its dimensions below. Older or fractional inch sizes need the ISO marking (e.g. 37-590).

For 32-622, width is 32 mm and rim diameter is 622 mm. Use the rear tire on mixed-wheel bikes. Leave both fields empty to compare ratios only.

Gear, dimension and cadence changes update results automatically.

Speeds are estimates. These calculations do not establish component compatibility or available tire clearance.

Parts & serviceability

Find replacement parts

Exact same part numberAlternative replacement option

Affiliate links may earn Velopedia a commission. As an Amazon Associate I earn from qualifying purchases.

Chain · Original
Shimano CN-IG90

1/2 x 3/32"

AlternativeOriginal not listed. Similar options:
Front tire · Original
26 x 2.10" WTB VelociRaptor kevlar
AlternativeOriginal not listed. Similar 26×2.10 tires:
26×2.10
26×2.1 · 60 TPI
26×2.10
Show 1 more
26×2.1 · 60 TPI
Seatpost · Original
Syncros Hardcore aluminum

27.2mm diameter

AlternativeSimilar options:
27.2mm x 330mm x 8mm
27.2×300

Other original parts

No matched retailer listings yet. Search marketplaces by part name.

Brake pads · Original
Shimano XTR V-Brake brakes

Shimano XTR levers

Bottom bracket · Original
Shimano BB-M950

112.5mm spindle

Crankset · Original
Shimano XTR M950

24/34/46 teeth

Rear derailleur · Original
Shimano XTR SGS
Shifters · Original
Shimano XTR RapidFire SL
Handlebar · Original
Syncros Hardcore
Stem · Original
Syncros Hardcore
Headset · Original
1 1/8" threadless Chris King NoThreadSet
Rims · Original
Mavic 217 SUP

32-hole

Hubs · Original
Shimano XTR

Based on the original build. Check fit and installed parts before ordering.

Parts and service referenceQuick reference before buying parts

Archived specifications for reference. Check the fitted parts before ordering.

Front tire
26 x 2.10" WTB VelociRaptor kevlar
Drivetrain
8-speed
Seatpost diameter
27.2 mm
Bottom bracket / shell
Shimano BB-M950, 112.5mm spindle · 68mm English
Equipment inspection checks 13 checks based on 6 archived component groups Open equipment checksClose equipment checks
0 of 13 checked Progress stays in this browser for this record.

Checks selected from the archived equipment. Confirm what is fitted today. This is not a complete safety inspection; use the full inspection guide before test riding.

Full used-bike inspection guide →

Archived: Frame: TIG-welded · Fork: Rock Shox Indy SL · Aluminum/magnesium, triple-clamp crown

Archived: Fork: Rock Shox Indy SL · Rear shock: Rock Shox Super Deluxe, 3.5" travel

Archived: Group: Shimano XTR · Shifters: Shimano XTR RapidFire SL · Front derailleur: Shimano XTR, bottom-pull/clamp-on 35.0mm · Rear derailleur: Shimano XTR SGS · Crankset: Shimano XTR M950, 24/34/46 teeth · Bottom bracket: Shimano BB-M950, 112.5mm spindle · Rear cogs: 8-speed, 11 - 34 teeth · Chain: Shimano CN-IG90, 1/2 x 3/32"

Archived: Brakes: Shimano XTR V-Brake brakes, Shimano XTR levers

Archived: Wheel size: 26" wheels · Rims: Mavic 217 SUP, 32-hole · Hubs: Shimano XTR · Front tire: 26 x 2.10" WTB VelociRaptor kevlar

Controls and contact points

Archived: Headset: 1 1/8" threadless Chris King NoThreadSet · Handlebar: Syncros Hardcore · Stem: Syncros Hardcore · Seatpost: Syncros Hardcore aluminum, 27.2mm diameter · Saddle: Bontrager w/titanium rails · Pedals: Not included

My Garage

Velopedia

Enter your email and Velopedia will send a private sign-in link. No password required.

Have you owned this model?Help preserve its real-world history by sharing your owner experience.

Share the details that would help another rider understand how this model fits, rides and holds up over time. Velopedia reviews every contribution before publication.

Add fit, maintenance and buyer detailsOptional · five additional fields

Your contribution goes directly to Velopedia’s private review queue. We’ll email an optional confirmation link plus a private edit and withdrawal link, but you do not need to confirm your email before an administrator can review or approve the submission.

Already contributed? Send me a fresh private edit link

For privacy, Velopedia shows the same confirmation whether or not an experience exists.

No recent price sample is available for this bike. Check eBay for matching listings.

Find this bike on eBay

Search eBay US; check the model year, size and installed components. We may earn a commission from purchases.

Scroll to Top